Watling House L6, London

Main Contractor: CAST
Installation Comprised of the following:
300 x Excel Cat 6A U/FTP Horizontal Links
1 x 42u 800x800 Excel Equipment Cabinet

null

Apex Plaza, Reading

Main Contractor: CAST

Installation Comprised of the following:

70 x Excel Cat 6A U/FTP Horizontal Links
1 x 21u 600x600mm Wall Mount Cabinet

null

Halcrow (Hammersmith) London

Main Contractor: M Moser Associates

Installation Comprised of the following:

3000+ Belden Cat6 U/UTP Horizontal Links

OM3 Multimode Fibre Backbone Links

Voice Backbone Links

10 x CPI Chatsworth Racks

4 x Excel Equipment Racks

null

IBM (South Bank) London

Main Contractor: Interserve Construction – Paragon Division

Installation Comprised of the following:

2000+ R&M Cat6a S/FTP Horizontal Links

OS1 Singlemode Fibre Backbone Links

null

Mediobanca, Victoria, London

Main Contractor: Interserve Construction – Paragon Division

Installation Comprised of the following:

750+ Excel Cat6 U/UTP Horizontal Links

2 x OM4 Multimode Fibre Backbone Links

8 x Server Cabinets

14 x LED Screens with wall/ceiling mount brackets

Tripleplay – IPTV installation

Tripleplay – Digital Signage

null

Science Museum, Dana Centre, London

Main Contractor: Interserve Construction – Paragon Division
Installation Comprised of the following:
100+ Brand Rex Cat6 U/UTP Horizontal Links

null

LEK Consulting LLP, London

Main Contractor: Area Sq

Installation comprised of:

700 x Excel Cat6 U/UTP Horizontal Links
3 x Excel Environ Cabinets
3 x APC 6000KVA UPS

null

British Business Bank, London

Main Contractor: Interserve Construction Paragon Division

Installation comprised of:

800 x Excel Cat 6a U/FTP Horizontal Links
(IRS) Integrated Reception System

null

Science Museum, Medicine Gallery, London

Main Contractor: Interserve Construction Paragon Division

Installation comprised of:

300 x Leviton Cat 6a U/FTP Horizontal Links

null

Confidential Home Office Department, Croydon

Main Contractor: Interserve Construction Paragon Division

Installation comprised of:

2000 x Excel Cat6 U/UTP Horizontal Links
107 x NEC 22/43/55/65” Commercial Displays
14 x Epson Projectors

null

Confidential Government Department, Westminster, London

Main Contractor: Interserve Construction Paragon Division

Installation comprised of:

400 x Leviton Cat 5e U/UTP Horizontal Links

null

Confidential Home Office Department, Croydon

Main Contractor: Interserve Construction Paragon Division

Installation comprised of the following:

2000 x Excel Cat6 U/UTP Horizontal Links
16 x Keytree Matrix Room Booking Tablets
11 x NEC 43/55” Commercial Displays
22 x NEC 22” Commercial Displays
4 x Epson Projectors

null

Ministry of Justice Medway County Court and Family Court

Main Contractor: Interserve Construction Paragon Division

Installation comprised of:

800 x Excel Cat 6 U/UTP Horizontal Links
8 x Excel OM4 12 Core Fibre Optic Backbone Links
3 X Excel Cat 3 50 Pair Backbone Links
3 x 42U 800 x 800 Excel Equipment Cabinets

null

International Committee Red Cross, London

Main Contractor: GPF Lewis

Installation comprised of the following:

100 x Excel Cat 6A U/FTP Horizontal Links
3 x Video Conference - Logitech Rally Plus

null

Department For Work and Pensions - Poplar

Main Contractor: ISG

Installation comprised of:

600 x Excel Cat 6 U/UTP Horizontal Links
2 x Excel OM4 12 Core Fibre Optic Backbone Links
3 x 42U 800 x 1000 Excel Equipment Cabinets

null

Department For Work and Pensions - Uxbridge

Main Contractor: ISG
Installation comprised of the following:

150 x Excel Cat6 U/UTP Horizontal Links
1 x 42u 800x1000 Excel Equipment Cabinet
1 x 15u 800x800 Excel Equipment Cabinet